  • Permian operator — 600+ days of production data.
  • Production differences show greater than 38% uplift for PropCoater™ wells versus controls after under two years.
  • Multi-interval development across Lower Spraberry and Wolfcamp targets.
  • Design details tracked per pad for coated versus uncoated comparisons.
Midland Basin – Case History #2
Midland Basin Case History #1 — Midland Basin – Case History #2
  • Stacked LSS/WCA/WCB development in Martin County — PropCoater™ vs control.
  • Approximately 23% uplift through the first eight months of production.
  • Four-well pad, 235 stages coated; increased max sand concentration and reduced fluid loading.
  • Customer requesting PropCoater™ for future wells; path to lower HHP and spread-rate savings.