Midland Basin Case History #1
Permian operator data comparing PropCoater™-treated pads to controls across stacked intervals in the Midland Basin.
- Permian operator — 600+ days of production data.
- Production differences show greater than 38% uplift for PropCoater™ wells versus controls after under two years.
- Multi-interval development across Lower Spraberry and Wolfcamp targets.
- Design details tracked per pad for coated versus uncoated comparisons.
- Stacked LSS/WCA/WCB development in Martin County — PropCoater™ vs control.
- Approximately 23% uplift through the first eight months of production.
- Four-well pad, 235 stages coated; increased max sand concentration and reduced fluid loading.
- Customer requesting PropCoater™ for future wells; path to lower HHP and spread-rate savings.
← Back to Midland Basin Case Histories · Customer testimonials